We – EPG Group the greatest worm gearbox, couplings and gears manufacturing facility in China with 5 various branches. For more specifics: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778083988828 /

Complete steel drum generation line

 

I. Raw materials usage/creation capacity
 

Plate thickness (mm) Finihed drums (pcs/T) Production capacity (kg/laptop)
1.2 forty one 21.five
1.0B Up and base addresses 1.2 47 19
Drum entire body 1.
1. fifty 18
0.9B Up and bottom addresses 1. 54 16.8
Drum body .9
0.nine 56 16.2
.eight   97 ten.28

 

II. Full metal drum production services

A. Entrance section tools
one. Decolier
2. Hydraulic Up-coiling device
3. Hydraulic supporter
4. Side deviation rectifying system
5. Sizing & flattening equipment
6. Slicing machine – for drum physique
7. Slicing equipment – for squander sheet
8. Arch shape guiding device
9. Stac ept car
10. Hydraulic method
eleven. Electric handle technique
twelve. Top & Base protect conveyor system

1.Hydraulic Up-Coiling  Device

   a) Up-Coiling Assistance Platform is for storing metal coil and facillitate Substance Feed Trolley for providing substance.

   b) Substance Feed Trolley is employed for have metal coil.. It is operated with hydraulic system to push cylinder for

   reciprocating linear motion and equipment box to deliver metal coil in parallel to the centre of uncoiling device so as to

   assure the repairing.

2.Decoiler & Hydraulic Supporter

a)Uncoiling width: 916-1320mm

b)Plate thickness: .6-1.2mm

c)Motor electrical power: 5.0KW

d)Uncoiler capacity: 10t

e)Within diameter: ¢470-520mm, Exterior diameter: ≤¢1200

f)Device size: 3900x1500x1940(mm), Total excess weight: 5T

three.Sizing &Flattening Machine
Quick introduction:7 rollers working,servo computerized sizing,worm and equipment alter the leveled plate thickness.

Perform:The clearances of up and down rollers can be modified by the upper hand-wheel whilst determine can be proven by dial indicator. The operation linear speed is adjusted step-much less. It can be controlled by the signal of mid-bridge for high and low speed change. 

Major technics:

a)Plate width: 916-1320(mm)

b)Plate thickness:.6-1.2(mm)

four. Cutting Machine
Function: Lower the leveled metal plate into drum physique.

Primary technics:

a)Plate width:≤1500mm

b)Plate thickness:≤3mm

c)Motor electricity: 3.0KW

d)Cutting capacity:≤20 moments/min

e)Device dimension:1800x950x1500(mm),Whole excess weight: 3T

 5.Hydraulic Station

Operate:Supply oil for the oil cylinder of decoiler, lifting gadget,uncoiling supporter,and overturn equipment to make sure stably working.

Primary technics:

a)Motor power:7.5KW

b)Machine dimensions:800x800x1500(mm),Overall bodyweight: .5T

6.Electric powered Handle System
Purpose: Control the decoiler,flattening equipment and other front part equipments working.

B. Protect products
1. Prime & Bottom cover mould
2. Double loc ept mould
three. 63T urgent machine
four. 160T urgent machine
5. Pre-coiling & Gluing equipment

one. Top & Bottom include mould

Short introduction:Equipped with two sets of 160T urgent machines

Function: Punching the bottom include

Principal technics:

a)Motor electrical power:18.5KW

b)Wor ept capacity:5-26 pcs/min

c)Equipment dimension:2185x1420x3070(mm),Total bodyweight: 14.5T

2.Drum Injection Mould

Quick introduction: Equipped with one set of 63T urgent equipment

Double punching mould: punch oil filler and breathable mouth of the base include.

Machine measurement: 710x480x300(mm)

Overall fat: .5T

Double loc ept mould: lock oil filler and breathable mouth of the bottom include.

Equipment dimensions: 710x480x300(mm)

Total fat: .5T

Major technics:

a)Motor power: 11KW

b)Equipment dimensions :1800x1232x2550(mm)

c)Complete weight: 5.5T

three.Pre-Coiling & Gluing Device

Brief introduction: Pre-coiling equipment for the base go over, cylinder push the cam to work, automated glue- spaying technique.It has positive aspects of safety,stablity, smooth edging.

 Main technics:

a)Equipment size:1600x1400x1350(mm)

b)Whole bodyweight: 4.5T

C. Middle segment equipment

1. Stac ept table
two. Circle-rolling device
three. Seam welding device
4. Edging & Beading device
5. Corrugation (W Rib) machine
6. Edge-curling machine
seven. Convey device
8. Electrical handle technique
9. Leakage chec ept machine

one.Circle-rolling Equipment

Short introduction:3 rollers functioning.

Main technics:

a)Rolled plated width:≤1100mm

b)Plate thickness:.6-1.2(mm)

c)Circle diameter:≤570mm

d)Motor power:1.5KW

e)Machine size:2200x750x1300(mm),Total weight: 1.5T

2.Seaming Equipment(BH-a hundred and fifty-5Z)

Short instruction:This automated seaming equipment dismisses the location welding method,it is our recently  developed drum seaming device.All of factors adopts domestic superior uncooked materials,cupreous welding rollers.

Primary technics:

a)Welding Machine ability:150KVA

b)Driving kind: pneumatic 

c)Present: alternating recent

d)Frequency variety: high frequency

e)Wor ept concept : contravariant 

3.Edging&Beading Machine

Short introduction:managed by PLC,hydraulic push

Main technics:

a)Beading height:≤14mm

b)Drum top:894-905(mm)

c)Hydraulic program force:8Mpa

d)Air force:.1Mpa

e)Equipment size:3700x700x1600(mm),Whole excess weight: 5T

Hydraulic Station:

Main technics:

a) Equipment size: 1800x860x1700 (mm)

b) Total excess weight: 1T

c) Motor electricity: 22KW

4.Corrugation (W rib) Equipment

Quick introduction:controlled by PLC,hydraulic push

Principal technics:

a)Corrugating height:≤3mm

b)W rib top:≤9mm

c)Drum height:884-895(mm)

d)W rib place:280mm

e)Motor power:11KW

f)Device dimensions:4500x650x2100(mm),Complete excess weight: 7T

Hydraulic station:   

a)Device size:1800x860x1700(mm)

b)Complete fat: 1T

c)Motor electrical power: 7.5KW

5.Edge-Curling Machine

Limited introduction:controlled by PLC,hydraulic push,7 levels edge curling.

Principal technics:

a)Drum top:886-897(mm)

b)Motor energy:45KW

c)Equipment dimensions:4800x1300x2200(mm),Whole fat: 13T

Hydraulic station:   

a)Device measurement:1800x860x1700(mm)

b)Total fat: 1T

c)Motor electricity: 7.5KW

six.  Leakage Chec ept Device

Brief introduction:Manual/computerized control,pneuma lock.

Major technics:

a)Chec ept drum diameter:560-570(mm)

b)Drum peak:886-897(mm)

c)Pressure:.03Mpa

d) Machine measurement:2530x700x1100(mm),Whole fat: 2T

7.Multi-segment Convey Gadget

Quick introduction:Convey the drum body to be edged,beaded,Corrugated W rib reinforced and sealed bottom include with PLC managing.

Main technics:

a) Motor electricity:4.0KW

b) Machine dimensions:11000x2100x1000(mm)

c) Whole fat: 3T

D. Rear section equipment
one. Entrance part trans-line
2. Degreasing & Phosphorization space
three. Washing & Drying room
4. Overturn gear
five. Painting area
six. Entrance drum-separation machine
seven. Drying space right after portray
eight. Bck drum separation equipment
9. Air cooling program
10. Rear area trans-line
eleven. Electrical manage technique

1. Degreasing & Phosphorization Space

Limited introduction: This part is utilised to transport the drums,managed by PLC, adopts spraying unit to automated clean the coil, phosphorize and washing the grease on the drums. The conveyor gadget adopts superior steel, inwalls are manufactured of  1mm metal plate.

Principal technics:

a)Equipment dimensions:36000x2110x2060(mm)

b)Whole weight: 30T

2. Washing & Drying Place

Short introduction:Drying the water on the floor of the drum, controlled by PLC.The total equipment adopts fuel heating devices.Supporter is put in on the leading of the area, so that scorching and cycling wind can be produced to pace up the drying.

Main technics:

a) Motor energy:25KW

b) Machine measurement:20000x1920x3600(mm)

c) Complete fat: 25T

three.Painting Place(double colours)


Function:  The conveyor system is managed by PLC, rotating table make the drums carefully, portray program paint the drums in & exterior with the spray gun. A single color or different can be option. Mode of h2o-curtain spraying dispels spraying smoke.Nozzle adopts Nordson Brand name, Painting equipment is produced of Chang Jiang.

Principal technics:

a) Motor electrical power: 55KW

b) Machine dimensions: 7400x4990x3600(mm)

c) Total excess weight: 15T

4.Entrance Drum Distributor

Purpose: Transport the drums to the conveyor line of outdoors portray&stiffening place, the cylinder is controlled by PLC.

Major technics:

a) Motor electricity: 2.0KW

b) Machine dimensions: 1500x1050x800(mm)

c) Whole excess weight: 1T

five.Drying Line after Portray

Perform: The conveyor gadget is managed by PLC, adopts fuel heating inwall of the room is geared up with heating tubes. Admirer is mounted on the best of the room, so that dry the paint.

Principal technics:

a) Motor energy: 35KW

b) Machine measurement: 36000x2100x4300(mm)

c) Whole excess weight: 30T

six.Down-drum Roller Trans-line

Purpose: The unit transports the dried drums to the ground.

Major technics:

a) Motor electrical power: 1.5KW

b) Device dimension:2000x900x800(mm)

c) Total excess weight: .3T

seven.Overturn Tools

Purpose: Alter the state of drums from horizontal to vertical, so that it will be much easier to paint, controlled by Cylinder.

Primary technics:

a) Device measurement: 1400x690x850(mm)

b) Total fat: .5T

 

 

 

 

 

 

   

 

 

 

 

 

/ The use of unique products manufacturer’s (OEM) portion figures or trademarks , e.g. CASE® and John Deere® are for reference needs only and for indicating merchandise use and compatibility. Our organization and the listed alternative elements contained herein are not sponsored, authorized, or produced by the OEM. /

Stainless used motor vehicle industry Cost  made in China - replacement parts -  in Prague Czechia  Steel Oil Drums Production Line with top quality

Stainless used motor vehicle industry Cost  made in China - replacement parts -  in Prague Czechia  Steel Oil Drums Production Line with top quality